Process
Director
|
Traditional
Manufacturing Systems
|
|
Start with a simplified process model to reduce
implementation time. Modeled process
complexity can evolve at a pace operations can absorb and implement.
|
Complex to set up and maintain. Large effort required before it can be
utilized.
|
|
No separately maintained routing file is
required. At the time of order
creation, a “dynamic” routing based on a process model is established
including only those tasks needed for the selected options.
|
Individual routing for each component or assembly
built in-house. Process change
impacts all routings in this process.
|
|
No separately maintained Bill of Material file is
required. Single level Material kits
are assigned at the task level in the process model. At the time of order creation, a “dynamic”
multilevel Bill of Material (BOM) is created based on scheduled tasks and
linked material kits. A traditional
multilevel bill of material representation is available on line or as a
printout.
|
Multi-level Bill of Materials must be created and
maintained for each manufactured item prior to using in an order regardless
of how minor a difference from existing items.
|
Tasks are scheduled through predetermined rules
and links in the Process Model automatically at order time. Online priority lists are available
throughout facility. PD includes
configurable master scheduling functions which automate the creation of work
orders and purchase orders based on sales and/or build to stock demand.
|
Master scheduling function is often un-flexible and
complex. Outputs are often in the form of large,
hard to read printouts.
|
|
Since tasks are updated in each reporting area as
they are completed, everyone in facility has access to real time status of
orders.
|
Production reporting is often a “batch” process;
i.e. updates are not real time.
Status outside of production areas is not available.
|
|
Material transactions “flow” based on the process
model and linked material kits. For
example, when task with a linked assembly kit is clicked complete, all
components of assembly are automatically relieved from inventory and assembly
is added to inventory in a “WIP” location at the next scheduled task work
area.
|
A separate inventory adjustment menu(s) has to be
accessed and inventory transactions created.
|
|
Inventory is organized by inventory “groups” that
have common characteristics. This
speeds creation of new inventory masters and allows “on the fly” inventory
number creation at order entry time.
|
Each inventory master is separately input. Inventory masters have to exist prior to
order entry time.
|
|
Includes office process control as well as the
shop floor, leading to reduction of paperwork and faster order processing.
|
Provides only shop floor production control.
|
|
Reporting areas have the ability to quickly input
shop labor, production numbers, scrap, rework, etc. against each scheduled
task in their priority list. While
barcode interface is available, it often is not any faster than just
reporting against tasks.
|
Shop floor job costing and labor reporting is
often a costly 3rd party system that needs to be interfaced to the
main system and/or requires more key punching input to obtain information.
|
|
Each reporting area has their own on line priority
list of tasks and, at a right click of mouse, a menu of functions specific to
their job function. This includes
built in PD functions and input screens as well as access to any Information
Director report or stored document.
PD can also launch 3rd party programs that are part of the
users required functions.
|
No equivalent function in traditional system. User has to go to separate area of menu
tree, launch another application, or look for a printed report.
|
|
System function and process flow is highly
configurable using built in setup function.
This setup requires no code modification and associated debug
cycle. Only a few people within a
customer’s organization need to be trained on this module. Once trained they can configure system
without the expense of outside help.
|
System is rigid requiring adherence to program
structure. Variations involve costly
custom programming.
|
|
Can be used also to model major projects that may
use the same resources assigned to production processes. PD has a full function project tracking
capability including real time project updates.
|
No equivalent function in traditional systems.
|
|
Reporting directly available from reporting area
menu can be in the form of a built in “Quick Report” function, automatically
filled in Excel templates and charts, or 3rd party report
generator. Includes automatic email
notifications and ability to update databases for special requirements.
|
Standard set of reports provided in some kind of
report generator. Optional reports
require navigating menu tree or launching separate application.
|
|
Accounting tasks can be included that interface
directly to 3rd party accounting system. For example, invoice task will have an Excel template of the
customer invoice automatically filled in with information based on order info
and input at the shipping task. Once
verified and invoice task clicked complete, the appropriate AR transactions
will automatically be created in the accounting database.
|
Often include proprietary accounting module that
replaces existing accounting system or requires separate operation to update
accounting system.
|
|
Process Director installation is done by
implementers that are also manufacturing operations efficiency experts. The setup process done at the beginning of
PD installation is an excellent time to streamline both office and production
processes to eliminate inefficiencies, better define employee job functions,
and better organize material flow.
|
Often done by implementers that are experts on the
software but not necessarily manufacturing operations. Because of the upfront requirement for
routings and bill of material databases more time is required for data
transfer and data input.
|